Projects |
Approved Budget for the Contract (Php) |
Pre-Bid Conference |
Deadline of Submission and Receipts of Bids |
Bid Bulletin |
Posting Date |
REPAIR/REHABILITATION AND CONSTRUCTION OF BRIDGES (Lot 8 - REGIRDERING OF VARIOUS STEEL BRIDGE SUPERSTRUCTURES WITHIN PNR HONDAGUA DIVISION) (NP 53.1. Two Failed Biddings) |
₱7,003,934.31 |
December 13, 2024 |
December 17, 2024 |
|
December 6, 2024 |
REPAIR/REHABILITATION AND CONSTRUCTION OF BRIDGES - Lot 2: CONSTRUCTION OF SAN RAMON BRIDGE (NP 53.1. - Two Failed Biddings) |
₱11,942,474.34 |
December 13, 2024 |
December 17, 2024 |
|
December 6, 2024 |
CONSTRUCTION OF SEAWALL (NP 53.2. EMERGENCY CASES) |
₱47,595,249.41 |
|
December 13, 2024 |
|
December 5, 2024 |
CONSTRUCTION/RENOVATION OF TRAIN PERSONNEL DORMITORY - LOT 3 - SAN PABLO (REBID) |
₱8,998,314.00 |
November 12, 2024 |
November 26, 2024 |
Bid Bulletin No. 1
Bid Bulletin No. 2
|
November 5, 2024 |
REPAIR/MAINTENANCE OF NAGA STATION (REBID) |
₱5,393,075.50 |
November 12, 2024 |
November 26, 2024 |
Bid Bulletin No. 1
|
November 5, 2024 |
REPLACEMENT OF PNR EXECUTIVE BUILDING ROOF (REBID) |
₱4,996,802.79 |
October 28, 2024 |
November 11, 2024 |
|
October 21, 2024 |
CONSTRUCTION/RENOVATION OF TRAIN PERSONNEL DORMITORIES - LOT 2 - LEGAZPI |
₱7,961,464.48 |
October 28, 2024 |
November 11, 2024 |
|
October 21, 2024 |
CONSTRUCTION OF RSM STAFF HOUSE AT NAGA (REBID) |
₱17,677,131.56 |
September 30, 2024 |
October 14, 2024 |
Bid Bulletin No. 1
Bid Bulletin No. 2
|
September 23, 2024 |
Repair/Rehabilitation and Construction of Bridges - Lot 8 - Regirdering of Various Steel Bridge Superstructures Within PNR Hondagua Division (2nd Rebid) |
₱7,003,934.31 |
September 30, 2024 |
October 14, 2024 |
Bid Bulletin No. 1 |
September 23, 2024 |
REPAIR/REHABILITATION AND CONSTRUCTION OF BRIDGES - LOT 2 CONSTRUCTION OF SAN RAMON BRIDGE |
₱11,942,474.34 |
- - - - - |
August 30, 2024 |
|
August 27, 2024 |
REPAIR/REHABILITATION AND CONSTRUCTION OF BRIDGES - LOT 9 – REGIRDERING OF VARIOUS STEEL BRIDGE SUPERSTRUCTURES WITHIN PNR NAGA DIVISION (REBID) |
₱34,797,187.16 |
August 28, 2024 |
September 10, 2024 |
Bid Bulletin No. 1 |
August 21, 2024 |
Repair/Maintenance of Naga Station |
₱5,393,075.50 |
August 15, 2024 |
August 30, 2024 |
|
August 6, 2024 |
CONSTRUCTION OF RSM STAFF HOUSE AT NAGA |
₱17,677,131.56 |
August 15, 2024 |
August 30, 2024 |
|
August 6, 2024 |
CONSTRUCTION OF ENGINEERING STAFF HOUSE AT NAGA |
₱17,677,131.56 |
August 15, 2024 |
August 30, 2024 |
|
August 6, 2024 |
CONSTRUCTION/RENOVATION OF TRAIN PERSONNEL DORMITORIES (LOT 3 – SAN PABLO) |
₱8,998,314.00 |
August 15, 2024 |
August 29, 2024 |
|
August 6, 2024 |
REPLACEMENT OF PNR EXECUTIVE BUILDING ROOF |
₱4,996,802.79 |
August 13, 2024 |
August 26, 2024 |
|
August 6, 2024 |
REPAINTING OF THE PNR EXECUTIVE BUILDING |
₱4,772,077.00 |
August 13, 2024 |
August 26, 2024 |
|
August 6, 2024 |
CONSTRUCTION/RENOVATION OF TRAIN PERSONNEL DORMITORIES - LOT 2 – LEGAZPI |
₱7,961,464.48 |
August 13, 2024 |
August 26, 2024 |
Bid Bulletin No. 1 |
August 6, 2024 |
REPAIR/REHABILITATION OF SECURITY OFFICES (LOT 1 - LUCENA) (Rebid) |
2,369,655.27 |
June 27, 2024 |
July 9, 2024 |
|
June 20, 2024 |
REPAIR/REHABILITATION AND CONSTRUCTION OF BRIDGES - LOT 8 - REGIRERING OF VARIOUS STEEL BRIDGE SUPERSTRUCTURES WITHIN PNR HONDAGUA DIVISION (REBID) |
7,003,934.31 |
June 27, 2024 |
July 9, 2024 |
|
June 20, 2024 |
CONSTRUCTION/RENOVATION OF TRAIN PERSONNEL DORMITORIES (LOT 1 – NAGA) |
7,488,198.41 |
May 30, 2024 |
June 11, 2024 |
|
May 23, 2024 |
STATION IMPROVEMENT (LOT 1 - PILI STATION) |
5,848,431.46 |
May 23, 2024 |
June 06, 2024 |
Bid Bulletin No. 1 |
May 16, 2024 |
STATION IMPROVEMENT (LOT 2 – LIBMANAN STATION) |
7,745,639.13 |
May 23, 2024 |
June 06, 2024 |
Bid Bulletin No. 1 |
May 16, 2024 |
REPAIR/ REHABILITATION OF SECURITY OFFICES (LOT 1 – LUCENA) |
2,369,655.27 |
May 23, 2024 |
June 06, 2024 |
Bid Bulletin No. 1 |
May 16, 2024 |
REPAIR/ REHABILITATION OF SECURITY OFFICES (LOT 2 – NAGA AND LEGAZPI) |
2,399,394.92 |
May 23, 2024 |
June 06, 2024 |
Bid Bulletin No. 1 |
May 16, 2024 |
Repair/Rehabilitation and Construction of Bridges - Lot 6 - Regirdering of Various Steel Bridge Superstructures within PNR Laguna Area - Lucena Division |
12,186,442.49 |
May 21, 2024 |
June 04, 2024 |
Bid Bulletin No. 1 |
May 14, 2024 |
Repair/Rehabilitation and Construction of Bridges - Lot 7 - Regirdering of Various Steel Bridge Superstructures within PNR Quezon Area - Lucena Division |
28,567,254.09 |
May 21, 2024 |
June 04, 2024 |
Bid Bulletin No. 1 |
May 14, 2024 |
Repair/Rehabilitation and Construction of Bridges - Lot 8 - Regirdering of Various Steel Bridge Superstructures Within PNR Hondagua Division |
7,003,934.31 |
May 21, 2024 |
June 04, 2024 |
Bid Bulletin No. 1 |
May 14, 2024 |
REPAIR/REHABILITATION AND CONSTRUCTION OF BRIDGES - LOT 9 – REGIRDERING OF VARIOUS STEEL BRIDGE SUPERSTRUCTURES WITHIN PNR NAGA DIVISION |
34,797,187.16 |
May 21, 2024 |
June 04, 2024 |
Bid Bulletin No. 1 |
May 14, 2024 |
REPAIR/REHABILITATION AND CONSTRUCTION OF BRIDGES - LOT 2 - CONSTRUCTION OF SAN RAMON BRIDGE (REBID) |
11,942,474.34 |
May 20, 2024 |
June 03, 2024 |
Drawings
Bid Bulletin No. 1
|
May 13, 2024 |
REPAIR/REHABILITATION AND CONSTRUCTION OF BRIDGES - LOT 3 - REPAINTING OF VARIOUS STEEL BRIDGE SUPERSTRUCTURES WITHIN PNR LUCENA DIVISION |
9,869,904.27 |
May 20, 2024 |
June 03, 2024 |
Bid Bulletin No. 1 |
May 13, 2024 |
REPAIR/REHABILITATION AND CONSTRUCTION OF BRIDGES - LOT 4 - REPAINTING OF VARIOUS STEEL BRIDGE SUPERSTRUCTURES WITHIN PNR HONDAGUA DIVISION |
11,720,337.75 |
May 20, 2024 |
June 03, 2024 |
Bid Bulletin No. 1 |
May 13, 2024 |
REPAIR/REHABILITATION AND CONSTRUCTION OF BRIDGES - LOT 5 - REPAINTING OF VARIOUS STEEL BRIDGE SUPERSTRUCTURES WITHIN PNR NAGA DIVISION |
14,890,647.04 |
May 20, 2024 |
June 03, 2024 |
Bid Bulletin No. 1 |
May 13, 2024 |
CONSTRUCTION OF SEAWALL |
47,595,249.41 |
May 16, 2024 |
June 07, 2024 |
Bid Bulletin No. 1
Bid Bulletin No. 2
Bid Bulletin No. 3
|
May 9, 2024 |
REHABILITATION/IMPROVEMENT OF LEVEL CROSSINGS INCLUDING CABINS AND BARRIERS |
33,578,753.70 |
May 16, 2024 |
May 28, 2024 |
Bid Bulletin No. 1 |
May 9, 2024 |
STATION IMPROVEMENT (LOT 1 - PILI STATION) |
5,848,431.46 |
November 30, 2023 |
December 12, 2023 |
|
|
STATION IMPROVEMENT (LOT 2 – LIBMANAN STATION) |
7,745,639.13 |
November 30, 2023 |
December 12, 2023 |
|
|
ENSURING EMBANKMENT WIDTH (Rebid) |
8,500,000.00 |
November 23, 2023 |
December 5, 2023 |
|
November 16, 2023 |
Repair/Rehabilitation and Construction of Bridges - Lot 2 - Construction of San Ramon Bridge |
11,942,474.34 |
November 23, 2023 |
December 5, 2023 |
|
November 16, 2023 |
Construction of CSR Building PNR |
4,731,383.16 |
November 17, 2023 |
November 29, 2023 |
|
November 10, 2023 |
Supply, Delivery and Installation of TETRA System Including Relocation of Existing PNR TETRA |
238,119,808.24 |
November 7, 2023 |
November 20, 2023 |
Bid Bulletin No. 1 |
|
CONSTRUCTION OF SEAWALL |
47,595,249.41 |
November 7, 2023 |
November 20, 2023 |
Bid Bulletin No. 1 |
|
Construction of Security and Administrative Office (Lot 4 - Hondagua) |
4,431,591.99 |
October 23, 2023 |
November 6, 2023 |
|
October 12, 2023 |
Construction of Security and Administrative Office (Lot 3 – Ligao) |
4,219,234.42 |
October 23, 2023 |
November 6, 2023 |
|
October 12, 2023 |
REPAIR/ REHABILITATION OF SECURITY OFFICES
(LOT 1 – LUCENA) (Re-bid)
|
2,369,655.27 |
September 29, 2023 |
October 12, 2023 |
Bid Bulletin No. 1 |
September 21, 2023 |
REPAIR/ REHABILITATION OF SECURITY OFFICES
(LOT 2 – NAGA AND LEGAZPI) (Re-bid)
|
2,399,394.92 |
September 29, 2023 |
October 12, 2023 |
Bid Bulletin No. 1 |
September 21, 2023 |
REHABILITATION/IMPROVEMENT OF LEVEL CROSSINGS INCLUDING CABINS AND BARRIERS (2nd REBID) |
33,578,753.70 |
September 6, 2023 |
September 18, 2023 |
Bid Bulletin No. 1
Bid Bulletin No. 2
Bid Bulletin No. 3
|
July 21, 2023 |
REPAIR/ REHABILITATION OF SECURITY OFFICES (LOT 2 – NAGA AND LEGAZPI) |
2,399,394.92 |
Jul7 28, 2023 |
August 10, 2023 |
Bid Bulletin No. 1
|
July 21, 2023 |
REHABILITATION/IMPROVEMENT OF LEVEL CROSSINGS INCLUDING CABINS AND BARRIERS |
33,578,753.70 |
June 23, 2023 |
July 6, 2023 |
|
June 15, 2023 |
Construction/Relocation of Automated Crossing Barrier (Re-bid) |
45,883,266.28 |
June 16, 2023 |
June 28, 2023 |
|
June 08, 2023 |
BALLAST PROTECTION WALL (Rebid) |
8,400,000.00 |
May 23, 2023 |
June 5, 2023 |
|
May 15, 2023 |
Construction/Relocation of Automated Crossing Barrier |
45,883,266.28 |
May 10, 2023 |
May 22, 2023 |
|
May 2, 2023 |
REHABILITATION/IMPROVEMENT OF LEVEL CROSSINGS INCLUDING CABINS AND BARRIERS |
33,578,753.70 |
May 10, 2023 |
May 22, 2023 |
|
May 2, 2023 |
BALLAST PROTECTION WALL |
8,400,000.00 |
April 13, 2023 |
April 25, 2023 |
|
ENSURING EMBANKMENT WIDTH |
8,500,000.00 |
April 13, 2023 |
April 25, 2023 |
|
REPAINTING OF PNR EXECUTIVE BUILDING |
6,851,818.64 |
March 30, 2023 |
April 24, 2023 |
Bid Bulletin No. 1
|
APPRAISAL SERVICES FOR PNR REAL PROPERTIES (RE-BID) |
8,500,000.00 |
August 25, 2022 |
September 8, 2022 |
Bid Bulletin No. 1
|
DESIGN AND BUILD OF PNR TRACK RELOCATION WORKS INCLUDING POCKET TRACKS, STATIONS, RCC BOX CULVERTS & OTHER CIVIL WORKS – SOLIS TO SUCAT (TRP-4A) |
1,799,933,297.33 |
June 16, 2022 |
August 18, 2022 |
Bid Bulletin No. 1
Bid Bulletin No. 2
Bid Bulletin No. 3
|
DESIGN AND CONSTRUCTION OF THIRTEEN (13) STEEL BRIDGES (TRP – 03) |
733,507,848.13 |
June 16, 2022 |
August 18, 2022 |
Bid Bulletin No. 1
Bid Bulletin No. 2
Bid Bulletin No. 3
|
DESIGN AND CONSTRUCTION OF NEW PNR PANDACAN RAILWAY BRIDGE (TRP-02) |
404,341,353.48 |
June 16, 2022 |
August 18, 2022 |
Bid Bulletin No. 1
Bid Bulletin No. 2
Bid Bulletin No. 3
|
DESIGN AND BUILD OF PNR TRACK RELOCATION WORKS INCLUDING POCKET TRACKS, STATIONS, RCC BOX CULVERTS & OTHER CIVIL WORKS – SOLIS TO SUCAT (TRP-4A) (Re-bid) |
1,602,103,085.60 |
March 17, 2022 |
April 21, 2022 |
Bid Bulletin No. 1
Bid Bulletin No. 2
Bid Bulletin No. 3
|
Design and Construction of Thirteen (13) Steel Bridges (TRP – 03) (Re-bid) |
702,082,195.18 |
March 17, 2022 |
April 21, 2022 |
Bid Bulletin No. 1
Bid Bulletin No. 2
Bid Bulletin No. 3
Bid Bulletin No. 4
|
Design and Construction of New PNR Pandacan Railway Bridge (TRP-02) (Rebid) |
382,084,430.99 |
March 17, 2022 |
April 21, 2022 |
Bid Bulletin No. 1
Bid Bulletin No. 2
|
PROCUREMENT OF DEMOLITION WORKS AND RETROFITTING OF AFFECTED PORTION OF THE EXISTING BUILDING OF PNR EXECUTIVE BUILDING, DEMOLITION OF OPERATOR DEPARTMENT PASSENGER CAR DIVISION, PNR TOWER, OPTICAL CLINIC AT TUTUBAN, AND REPLICATION/RELOCATION OF ELEVATED WATER TANKS AND COMMUNICATION TOWER AT TONDO, CITY OF MANILA (2nd RE-BID) |
44,974,500.21 |
March 3, 2022 |
March 17, 2022 |
Bid Bulletin No. 1
Bid Bulletin No. 2
|
PROCUREMENT OF SERVICES FOR THE DEMOLITON OF THE TWO BAYS AND RESTORATION WORKS OF THE EXISTING HEAVY MAINTENANCE WORKSHOP AT THE EXISTING PNR CALOOCAN DEPOT |
13,219,874.72 |
January 05, 2021 |
January 17, 2021 |
Bid Bulletin No. 1
|
DESIGN AND BUILD OF PNR TRACK RELOCATION WORKS INCLUDING POCKET TRACKS, STATIONS, RCC BOX CULVERTS & OTHER CIVIL WORKS – SOLIS TO SUCAT (TRP-4A) |
1,602,103,085.60 |
November 23, 2021 |
December 28, 2021 |
Link for Suplemental Documents
Bid Bulletin No. 1
Bid Bulletin No. 2
Bid Bulletin No. 3
Bid Bulletin No. 4
Bid Bulletin No. 5
|
Design and Construction of Thirteen (13) Steel Bridges (TRP–03) |
702,082,195.18 |
November 12, 2021 |
December 17, 2021 |
Bid Bulletin No.1
Bid Bulletin No.2
Bid Bulletin No.3
Bid Bulletin No.4
Bid Bulletin No.5
Bid Bulletin No.6
|
Design and Construction of New PNR Pandacan Railway Bridge (TRP-02) |
382,084,430.99 |
November 12, 2021 |
December 17, 2021 |
Bid Bulletin No.1
Bid Bulletin No.2
Bid Bulletin No.3
Bid Bulletin No.4
Bid Bulletin No.5
Bid Bulletin No.6
|
Procurement of Demolition Works and Retrofitting of Affected Portion of the Existing Building of PNR Executive Building Demolition of Operator Department Passenger Car Division, PNR Tower, Optical Clinic At Tutuban, and Replication/Relocation of Elevated Water Tanks and Communication Tower at Tondo, City of Manila (Re-Bid) |
44,974,500.21 |
November 4, 2021 |
November 18, 2021 |
Bid Bulletin No.1
Bid Bulletin No.2
|
Procurement of Services for the Relocation and Demolition of the Existing Light Repair Shop (COMMEX) and other related Civil Works Along Sta. -2+211.864 to Sta. -0+943.484 (Re-Bid) Under Design and Build Contract Scheme |
187,303,040.27 |
November 4, 2021 |
November 18, 2021 |
Bid Bulletin No.1
Bid Bulletin No. 2
|
Design and Build of Operations Control Center (OCC) and Training Center |
56,499,668.06 |
September 15, 2021 |
September 29, 2021 |
|
PROCUREMENT OF DEMOLITION WORKS AND RETROFITTING OF AFFECTED PORTION OF THE EXISTING BUILDING OF PNR EXECUTE BUILDING , DEMOLITION OF OPERATIONS DEPARTMENT PASSENGER CAR DIVISION, PNR TOWER, OPTICAL CLINIC AT TUTUBAN, AND REPLICATION/RELOCATION OF ELEVATED WATER TANKS AND COMMUNICATION TOWER AT TONDO, CITY OF MANILA |
44,974,500.21 |
August 24, 2021 |
September 07, 2021 |
Bid Bulletin No. 1
Bid Bulletin No. 2
|
PROCUREMENT OF SERVICES FOR THE RELOCATION AND DEMOLITION OF THE EXISTING LIGHT REPAIR SHOP (COMMEX) AND OTHER RELATED CIVIL WORK ALONG STA. -2 +211.864 TO STA. -0 +943.484 |
187,303,040.27 |
August 24, 2021 |
September 07, 2021 |
Bid Bulletin No. 1
Bid Bulletin No. 2
|
Design and Build of PNR Executive Building |
300,000,000.00 |
December 27, 2019 |
February 06, 2020 |
Bid Bulletin No. 2 Bid Bulletin No. 3 |
Design and Build of Manila Rolling Stocks Maintenance Workshop (rebid) P1 P2 |
180,243,098.65 |
November 27, 2019 |
December 09, 2019 |
Supplemental Bid No.1 |
Design and Build Services for The Construction of End Span of Ragay Bridge (2nd rebid) |
25,628,600.00 |
November 27, 2019 |
December 09, 2019 |
Supplemental Bid No.1 |
Construction of Sea Wall (rebid) |
39,500,000.00 |
November 27, 2019 |
December 09, 2019 |
Supplemental Bid No.1 |
Design and Build Services of Two PNR Steel Platforms and Passenger Shelters with Prefab Office (2nd Rebid) |
20,000,000.00 |
November 7, 2019 |
November 19, 2019 |
|
Supply and Installation of PVC Sheet pile for Fencing within Manila Division |
43,448,660.00 |
November 06, 2019 |
November 18, 2019 |
|
Design and Build of Level Crossing Rubber Surface for Railroad Including Edge Screw Security Box |
30,000,000.00 |
November 06, 2019 |
November 18, 2019 |
|
Construction of Culvert along Main Line South |
10,160,925.00 |
November 06, 2019 |
November 18, 2019 |
|
Design and Build of Calamba Rolling Stocks Maintenance Workshop |
119,756,901.35 |
October 29, 2019 |
November 11, 2019 |
Supplemental Bid No. 1 |
Design and Build of Manila Rolling Stocks Maintenance Workshop |
180,243,098.65 |
October 29, 2019 |
November 11, 2019 |
Supplemental Bid No. 1 |
Design and Build Services for The Construction of End Span of Ragay Bridge (rebid) |
25,628,600.00 |
October 29, 2019 |
November 11, 2019 |
Supplemental Bid No. 1 |
Construction of Sea Wall |
39,500,000.00 |
October 29, 2019 |
November 11, 2019 |
Supplemental Bid No. 1 |
Construction/Repair of Various Bridges Within Manila Division |
60,000,000.00 |
October 29, 2019 |
November 11, 2019 |
Supplemental Bid No. 1
Supplemental Bid No. 2
|
Construction of Warehouse at Naga (rebid) |
5,000,000.00 |
October 18, 2019 |
October 30, 2019 |
|
Procurement and Installation of Signages/Warning Device |
10,000,000.00 |
October 07, 2019 |
October 21, 2019 |
|
Renovation of Engineering Naga Office |
1,500,000.00 |
August 09, 2019 |
August 22, 2019 |
Supplemental Bid No. 1 |
Renovation of Engineering Lucena Office |
1,500,000.00 |
August 09, 2019 |
August 22, 2019 |
Supplemental Bid No. 1 |
Train Personnel Dormitory |
10,522,749.36 |
August 09, 2019 |
August 22, 2019 |
Supplemental Bid No. 1 |
Construction of Warehouse at Naga |
5,000,000.00 |
August 09, 2019 |
August 22, 2019 |
Supplemental Bid No. 1 |
Construction of Ballast Protection Wall Manila Division |
15,900,720.00 |
August 09, 2019 |
August 22, 2019 |
Supplemental Bid No. 1 |
Design and Build Services for The Construction of End Span of Ragay Bridge |
25,628,600.00 |
August 09, 2019 |
August 22, 2019 |
Supplemental Bid No. 1 |
Design and Build Services of Two Steel Platforms and Passenger Shelters with Prefab Office |
20,000,000.00 |
August 09, 2019 |
August 22, 2019 |
Supplemental Bid No. 1 |
Conversion of Bayanan Bridge into One Span Bridge at KM29.60-KM29.65 (2nd rebid)
|
5,221,800.00 |
December 17, 2018 |
January 08, 2019 |
Supplemental Bid. No. 1 |
Regirdering of Inagbuhan 1 Bridge at KM204.10 - KM 204.15
|
1,319,906.45 |
December 17, 2018 |
January 08, 2019 |
Supplemental Bid. No. 1 |
Reconstruction of San Ramon Bridge |
5,837,000.00 |
December 17, 2018 |
January 08, 2019 |
Bid Bulletin No.1 |
Rehabilitation of Crossing Cabins |
8,500,000.00 |
December 13, 2018 |
January 07, 2019 |
Supplemental Bid. No. 1 |
Conversion of Bridges to Box Culverts – Lucena Division (3rd Rebid)
|
5,000,000.00 |
December 13, 2018 |
January 07, 2019 |
Supplemental Bid. No. 1 |
Supply and Installation of 8mm thick CC8 Geosynthetic Cementitious Composite mat (GCCM) Line Ditch (2nd Rebid) |
23,280,000.00 |
December 13, 2018 |
January 07, 2019 |
Supplemental Bid. No. 1 |
Construction of Line Canal (Manila Yard) |
6,096,020.29 |
December 13, 2018 |
January 07, 2019 |
Supplemental Bid. No. 1 |
Reconstruction of Three (3) Bridges in Naga Division (2nd Rebid) |
40,932,378.56 |
December 13, 2018 |
January 07, 2019 |
Supplemental Bid. No. 1 |
Construction of Ballast Protection Wall within Naga Division (3rd Rebid) |
29,406,420.00 |
December 13, 2018 |
January 07, 2019 |
Supplemental Bid. No. 1 |
Regirdering of San pedro Bridge (3rd Rebid) |
4,167,280.00 |
November 26,2018 |
December 10, 2018 |
|
Construction of Bank Protection between KM13+650 - KM13+800 at Manila Division (2nd Rebid)
|
2,863,900.00 |
November 26,2018 |
December 10, 2018 |
|
Painting of Steel Bridge Superstructures - Naga Division (4th Rebid)
|
4,996,537.00 |
November 26,2018 |
December 10, 2018 |
|
Construction of Ballast Protection Wall (3rd Rebid) |
21,000,000.00 |
November 26,2018 |
December 10, 2018 |
|
Construction of Ballast Protection Wall |
15,900,720.00 |
November 16, 2018 |
November 28, 2018 |
Notice of Postponement
|
Conversion of Bayanan Bridge into One Span Bridge at
KM29.60-KM29.65
|
5,221,800.00 |
November 16, 2018 |
November 28, 2016 |
Notice of Postponement |
Reconstruction of three (3) Bridges in Naga Division (Rebid) |
40,932,378.56 |
October 26, 2018 |
November 09, 2018 |
|
Construction of concrete lined ditch (31,200 LM) within Naga Division (2nd Rebid) |
75,081,678.00 |
October 26, 2018 |
November 09, 2018 |
|
Suppy and installation of 8mm THK CC8 Geosysthetic Cementitious Composite Mat (GCCM) lined ditch (Rebid) |
23,280,000.00 |
October 26, 2018 |
November 09, 2018 |
|
Construction of Bank Protection - Hondagua Division (2nd Rebid) |
43,985,739.27 |
October 17, 2018 |
October 31, 2018 |
|
Construction of Bank Protection – Lucena Division (2nd Rebid)
|
1,309,107.73 |
October 17, 2018 |
October 31, 2018 |
|
Construction of Bank Protection – Manila Division (2nd Rebid) |
2,863,900.00 |
October 17, 2018 |
October 31, 2018 |
|
Construction of Bank Protection – Naga Division (2nd Rebid) |
3,705,153.00 |
October 17, 2018 |
October 31, 2018 |
|
Regirdering of San Pedro Bridge (2nd Rebid) |
4,167,280.00 |
October 17, 2018 |
October 31, 2018 |
|
Construction of Ballast Protection Wall in Manila Division (2nd Rebid)
|
15,900,720.00 |
October 17, 2018 |
October 31, 2018 |
|