PROJECT | Last Update | ATTACHMENT |
---|---|---|
Supply and Distribution of 81,100 cu.m. Ballast including Survey Works, Clearing and Grubbing, Scraping of Trackbed, Lifting of Track, Insertion of Ballast, Tamping and Regulating of Ballast, and Track Alignment from Naga to Legazpi (rebid) | June 7, 2016 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (June 8, 2016) |
Design and Build Services for the Regirdering of Various Steel Bridge Superstructures for Manila Division | May 28, 2016 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (June 6, 2016) |
Design and Build Services for the Regirdering of Various Steel Bridge Superstructures for Lucena Division | May 28, 2016 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (June 6, 2016) |
Supply and Delivery of 7,529 pcs. of 37kg x 20 Meter Rails including Angle Bars and Trackbolts | May 28, 2016 | SuppBid Bulletin No. 1 |
Supply, Delivery, Installation, Commissioning and Testing of PNR Train and Platform Management and CCTV Surveillance Command Center System Project - 2nd rebid | May 23, 2016 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (June 1, 2016)SuppBid Bulletin No. 3 (June 8, 2016)SuppBid Bulletin No. 2 (June 1, 2016) SuppBid Bulletin No. 4 (June 17, 2016) |
Supply and Delivery of 3,112 Pieces of 8” x 8” x 8’ Bridge Wood Sleeper | May 11, 2016 | SuppBid Bulletin No. 1 |
Supply and Delivery of Huckbolts Tools and Equipment Including Accessories and Huckbolts | May 4, 2016 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (May 12, 2016) |
Supply and Distribution of 81,100 cu.m. Ballast including Survey Works, Clearing and Grubbing, Scraping of Trackbed, Lifting of Track, Insertion of Ballast, Tamping and Regulating of Ballast, and Track Alignment from Naga to Legazpi | April 21, 2016 | SuppBid Bulletin No. 1 |
Design and Build Services for the Regirdering of Various Steel Bridge Superstructures for Manila Division | April 21, 2016 | SuppBid Bulletin No. 1 |
Repainting of Facade and Exterior Walls of the PNR Exec. Bldg. including all other Exposed Steel Windows and Aircon Framing and Gutters (rebid) | April 21, 2016 | SuppBid Bulletin No. 1 |
Supply and Installation of Lateral Conduit for Fiber Optic Requirment of Twenty Four (24) Locations of PNR Stations (Negotiated Procurement) | February 22, 2016 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (February 26, 2016) |
Supply, Delivery, Installation, Commissioning and Testing of PNR Train and Platform Management and CCTV Surveillance Command Center System Project - rebid | February 15, 2016 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (February 17, 2016) SuppBid Bulletin No. 3 (February 26, 2016) SuppBid Bulletin No. 4 (March 3, 2016) |
Supply and Distribution of Ballast (18,000 cu.m) - (2nd rebid) | February 16, 2016 | SuppBid Bulletin No. 1 |
Station Development and Station Yard Fencing for the Commuter Line of PNR (Cluster 4 - FTI, Bicutan & Sucat) - rebid | February 10, 2016 | SuppBid Bulletin No. 1 Annex A (Supp Bid 1) SuppBid Bulettin No. 2 |
Supply and Distribution of Ballast (18,000 cu.m) from TP7556-TP7916 (rebid) | December 16, 2015 | SuppBid Bulletin No. 1 Supp Bid Bulletin No. 2 (December 22, 2015) |
Repainting of Facade and Exterior Walls of the PNR Exec. Bldg. including all other Exposed Steel Windows and Aircon Framing and Gutters | December 14, 2015 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (December 29, 2015) SuppBid Bulletin No. 3 (January 6, 2016) |
Supply and Delivery of 30,000 Pieces of Prestressed Concrete Sleepers including Complete Sets of Rail Fastening Components | December 14, 2015 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (December 29, 2015) SuppBid Bulletin No. 3 (January 4, 2016) SuppBid Bulletin No. 4 (January 8, 2016) |
Supply and Delivery of 3,112 Pieces of 8" x 8" x 8' Bridge Wood Sleepers | November 12, 2015 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (November 23, 2015) SuppBid Bulletin No. 3 (December 1, 2015) SuppBid Bulletin No. 4 (December 7, 2015) SuppBid Bulletin No. 5 (December 11, 2015) SuppBid Bulletin No. 6 (December 21, 2015) SuppBid Bulletin No. 7 (December 28, 2015) SuppBid Bulletin No. 8 (January 19, 2016) |
Station Development and Station Yard Fencing for the Commuter Line of PNR (Cluster 1 - Tutuban, Blumentritt & España) | October 29, 2015 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (November 4, 2015) |
Station Development and Station Yard Fencing for the Commuter Line of PNR (Cluster 2 - Sta. Mesa & Paco) | October 29, 2015 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (November 4, 2015) |
Station Development and Station Yard Fencing for the Commuter Line of PNR (Cluster 3 - Dela Rosa & Edsa) | October 29, 2015 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (November 4, 2015) SuppBid Bulletin No. 3 (December 7, 2015) SuppBid Bulletin No. 4 (December 15, 2015) SuppBid Bulletin No. 5 (December 21, 2015) |
Station Development and Station Yard Fencing for the Commuter Line of PNR (Cluster 4 - FTI, Bicutan & Sucat) | October 29, 2015 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (November 4, 2015) SuppBid Bulletin No. 3 (December 7, 2015) SuppBid Bulletin No. 4 (December 15, 2015) SuppBid Bulletin No. 5 (December 21, 2015) |
Supply and Delivery of Capital Parts for Diesel Electrical Locomotives (DEL) | October 13, 2015 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (December 22, 2015) |
Supply of Lightweight Compact Rail Drilling Machine (8 Nos.) and Lightweight Abrasive Rail Cutting Machine | October 13, 2015 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (Decmber 22, 2015) |
Supply of Thermit Welding Materials, Tools and Equipments | October 13, 2015 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (Decmber 22, 2015) |
Supply and Delivery of One (1) Unit Asian Utility Vehicle (AUV) (Rebid) | October 13, 2015 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (October 16, 2015) |
Supply and Distribution of Ballast (18,000 cu.m) from TP7556-TP7916 | October 7, 2015 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (Oct. 8, 2015) SuppBid Bulletin No. 3 (Oct. 16, 2015) |
Supply and Installation of Lateral Conduit for Fiber Optic Requirements for Twenty Four (24) Locations of PNR Commuter Stations | October 5, 2015 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (Oct. 13, 2015) SuppBid Bulletin No. 3 (Oct. 20, 2015) SuppBid Bulletin No. 4 (Oct. 26, 2015) |
Supply, Delivery, Installation, Commisioning and Testing of PNR Train and Platform Management and CCTV Surveillance Command Center System Project | September 14, 2015 | SuppBid Bulletin No. 1 |
Supply and Delivery of 8,620 Pieces of Angle Bars for 37kg. Rails | August 28, 2015 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (Sept. 2, 2015) |
Supply and Delivery of 30,000 Pieces of Track Bolts with Nuts and Spring Washers | August 28, 2015 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (Sept. 2, 2015) |
Supply and Delivery of One (1) Unit Asian Utility Vehicle (AUV) | August 28, 2015 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (Sept. 2, 2015) SuppBid Bulletin No. 3 (Sept. 8, 2015) SuppBid Bulletin No. 4 (Sept. 17, 2015) |
Reconstruction of Candelaria Station Building, Passenger Shelter and Platform | August 28, 2015 | SuppBid Bulletin No. 1 |
Reconstruction of Gumaca Station Building, Passenger Shelter and Platform | August 28, 2015 | SuppBid Bulletin No. 1 |
Reconstruction of Hondagua Station Building, Passenger Shelter and Platform | August 28, 2015 | SuppBid Bulletin No. 1 |
Reconstruction of Libmanan Station Building, Passenger Shelter and Platform | August 28, 2015 | SuppBid Bulletin No. 1 |
Reconstruction of Pili Station Building, Passenger Shelter and Platform | August 28, 2015 | SuppBid Bulletin No. 1 |
Renovation of Station Building, Passenger Shelter and Platform of Ragay Station | August 28, 2015 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (Sept. 2, 2015) |
Renovation of Station Building, Passenger Shelter and Platform of Tagkawayan Station | August 28, 2015 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (Sept. 2, 2015) |
Conversion of Temporary Bridges to RC Pipe Culverts | July 2, 2015 | SuppBid Bulletin No. 1 |
Supply and Installation of Lateral Conduit for Fiber Optic Requirements for Twenty Four (24) Locations of PNR Commuter Stations (rebid) | July 2, 2015 | SuppBid Bulletin No. 1 |
Station Development and Station Yard Fencing for the Commuter Line of the Philippine National Railways (Cluster 1 – Tutuban, Blumentritt, Laon-laan & España) |
May 22, 2015 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (May 29, 2015) SuppBid Bulletin No. 3 (June 8, 2015) |
Station Development and Station Yard Fencing for the Commuter Line of the Philippine National Railways (Cluster 2 – Sta. Mesa, Pandacan, Paco & San Andres) |
May 22, 2015 | SuppBid Bulletin No. 1SuppBid Bulletin No. 2 (May 29, 2015) SuppBid Bulletin No. 3 (June 8, 2015) |
Station Development and Station Yard Fencing for the Commuter Line of the Philippine National Railways (Cluster 3 – Vito Cruz, Dela Rosa (in place of Buendia), Pasay Road & Edsa) |
May 22, 2015 | SuppBid Bulletin No. 1SuppBid Bulletin No. 2 (May 29, 2015) SuppBid Bulletin No. 3 (June 8, 2015) |
Station Development and Station Yard Fencing for the Commuter Line of the Philippine National Railways (Cluster 4 – Nichols, FTI, Bicutan & Sucat) |
May 22, 2015 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (May 29, 2015) SuppBid Bulletin No. 3 (June 8, 2015) |
Supply, Delivery, Installation, Commissioning and Testing of PNR Train and Platform Management and CCTV Surveillance Command Center System Project | May 7, 2015 | SuppBid Bulletin No. 1 |
Supply and Installation of Lateral Conduit for Fiber Optic Requirements for Twenty Four (24) Locations of PNR Commuter Stations | May 6, 2015 | SuppBid Bulletin No. 1 |
Supply and Delivery of 11,904 pieces Hook Bolts with Hexagonal Nuts & Square Washer | May 6, 2015 | SuppBid Bulletin No. 1SuppBid Bulletin No. 2 (May 11, 2015) |
Procurement of Security Services for Area of Responsibility I | April 14, 2015 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (April 16,2015) SuppBid Bulletin No. 3 (April 22,2015) SuppBid Bulletin No. 4 (April 23,2015) |
Supply and Distribution of Ballast (27,777 cu. m.) including Clearing and Grubbing, Scraping of Trackbed, Lifting of Track, Insertion of Ballast, Tamping and Regulating of Ballast, Track and Alignment | April 14, 2015 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (April 16,2015) SuppBid Bulletin No. 3 (April 28,2015) SuppBid Bulletin No. 4 (April 30,2015) SuppBid Bulletin No. 5 (May 6,2015) |
Procurement of Consulting Services for Program Management, Capacity Building Consulting Services fo PNR Capital Improvement Projects | March 25, 2015 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (March 30, 2015) SuppBid Bulletin No. 3 (April 7, 2015) SuppBid Bulletin No. 4 (April 15, 2015) SuppBid Bulletin No. 5 (May 8, 2015) SuppBid Bulletin No. 6 (May 8, 2015) SuppBid Bulletin No. 7 (May 28, 2015) SuppBid Bulletin No. 8 (June 30, 2015) |
Retrofitting of North Abutment of AGOS Bridge (TP8499-TP8501) | March 18, 2015 | SuppBid Bulletin No. 1 |
Construction of Single Span R.C. Slab Bridge | March 18, 2015 | SuppBid Bulletin No. 1 |
Conversion of Temporary Bridge to RC Pipe Culvert | March 18, 2015 | SuppBid Bulletin No. 1 |
Supply of Services to Facilitate the Transport of Donated Used Disel Multiple Units, KIHA Series 350 (rebid) | March 5, 2015 | SuppBid Bulletin No. 1 |
Ensuring Embankment Width (40,300 cu.m.) | March 2, 2015 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (March 9,2015) |
Restoration of Station Building, Passenger Shelter and Platform of Lucena Station | March 2, 2015 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (March 9,2015) |
Restoration of Station Building, Passenger Shelter and Platform of San Pablo Station | March 2, 2015 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (March 9,2015) |
Supply of Services to Facilitate the Transport of Donated Used Disel Multiple Units, KIHA Series 350 | February 5, 2015 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (February 9, 2015) |
Supply and Delivery of Capital Parts for Diesel Electric Locomotive (DEL) |
February 5, 2015 | SuppBid Bulletin No. 1 |
Procurement of PNR Rolling Stock & Maintenance Manpower Services | January 29, 2015 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 (February 05, 2015) |
Supply and Delivery of 30,000 Pieces Prestressed Concrete Sleepers including Complete Sets of Rail Fastening Components | January 29, 2015 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 SuppBid Bulletin No. 3 |
Supply and Distribution of Ballast (36,700 cu.m) including Clearing and Grubbing, Scraping of Trackbed, Lifting of Track, Insertion of Ballast, Tamping and Regulating of Ballast and Track Alignment | January 26, 2015 | SuppBid Bulletin No. 1 |
Supp. Bid Bulletin No. 1 - Retrofitting of North AGOS Bridge (TP8499-TP8501) | January 26, 2015 | SuppBid Bulletin No. 1 |
Supply and Delivery of Capital Parts for Diesel Multiple Units (DMU's) | December 18, 2014 | SuppBid Bulletin No. 3 SuppBid Bulletin No. 4 SuppBid Bulletin No. 5 SuppBid Bulletin No. 6 (Dec. 22, 2014) |
Supply and Delivery of Capital Parts for Diesel Electric Locomotives | December 18, 2014 | SuppBid Bulletin No. 3 SuppBid Bulletin No. 4 SuppBid Bulletin No. 5 |
Negotiated Procurement for the Regirdering of Two (2) Steel Bridge Superstructures within Camarines Sur Province | September 18, 2014 | SuppBid Bulletin No. 1 |
The Procurement of Consulting Services for the Technical Inspection and Safety Assessment of the Philippine National Railways' Tracks and Bridges | August 5, 2014 | SuppBid Bulletin No. 1 (July 28, 2014) SuppBid Bulletin No. 2 SuppBid Bulletin No. 3 |
Supply and Delivery of Forty Thousand Sets (40,000 sets) of Rail Fastening composed of Rail Clips, Cast Iron Shoulders, Rail Insulators and Rail Pads | May 08, 2014 | SuppBid Bulletin No. 1 |
Negotiated Procurement for the General Overhaul and Upgrading of Diesel Electric Locomotive Nos. 918, 919 and 921 | April 28, 2014 | SuppBid Bulletin No. 1 |
Supply and Delivery of Forty Thousand Sets (40,000 sets) of Rail Fastening composed of Rail Clips, Cast Iron Shoulders, Rail Insulators and Rail Pads | April 28, 2014 | SuppBid Bulletin No. 9 |
Procurement of Security Services for Are of Responsibility II | April 16, 2014 | SuppBid Bulletin No. 1 |
Construction of Concrete Lined Ditch(4,500 lin.m.) | April 16, 2014 | SuppBid Bulletin No. 1 |
Supply of 1,000pcs. 37 kg. x 20 meter Rails including Rail Fishplates and Trackbolts | April 16, 2014 | SuppBid Bulletin No. 1 |
Supply and Distribution of Ballast including Clearing and grubbing, Scraping of Trackbed, Lifting of Track, Insertion of Ballast, Tamping and Regulating of Ballast and Track Alignment | April 16, 2014 | SuppBid Bulletin No. 1 |
Procurement of Supply and Delivery of Voith Transmission Parts for Diesel Multiple Unit (DMU) | March 26, 2013 | SuppBid Bulletin No. 1 |
Procurement of Supply and Delivery of Air Conditioner Parts for Diesel Multiple Unit (DMU) | March 26, 2013 | SuppBid Bulletin No. 1 |
Procurement of Supply and Delivery of Air Conditioner Parts for Diesel Multiple Unit (DMU) | February 22, 2013 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 |
Procurement of Supply and Delivery of Two (2) Sets of Auxiliary Power Unit | February 22, 2013 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 |
Procurement of Supply and Delivery of Construction Materials for the Conversion of Temporary Bridges to Reinforced Concrete Box Culverts | February 22, 2013 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 |
Procurement of Repair and Repainting of Gumaca station including Construction of Comfort Room | February 22, 2013 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 |
Procurement of Replacement of Existing Vinyl Tiles at PNR Executive Building | February 22, 2013 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 |
Procurement of Supply and Delivery of Voith Transmission Parts for Diesel Multiple Unit (DMU) | February 22, 2013 | SuppBid Bulletin No. 1 SuppBid Bulletin No. 2 |
- Hits: 10010